Construction Period:
April 2016-August 2018
Location:
Linkou District, New Taipei City
Project Cost:
Approximately NT$ 185 million
April 2016-August 2018
Linkou District, New Taipei City
Approximately NT$ 185 million
The first "Golden Class" certified "Sampo Smart Home" in the Linkou area of New Taipei City.
After winning the land lease for 70 years in 2014, S. Pod Enterprise entrusted Shengbao Construction, a subsidiary, with planning and design, and then subcontracted the project to BES Engineering for construction. BES Engineering's main construction projects include foundation, structure, exterior decoration, interior design, and mechanical and electrical engineering. This project is the first construction project for S. Pod Group, consisting of 54 units, with each unit approximately 28 to 34 ping.
Site Area:2,082.6 sqm
Floor Area:7,299.2 sqm
Floor Plan:2 basement floors, 9 above-ground floors
Structural Design:Reinforced Concrete (RC) structure