National Cheng Kung University Hospital

National Cheng Kung University Hospital

Construction Period:

December 2006-July 2010 

Location:

No. 138, Shengli Road, Tainan City 

Project Cost:

Approximately NT$ 1.69 billion 

Awards

Project Introduction and Features

The project's design and planning comply with the five indicators of green building, and it has obtained a candidate green building certificate (Candidate Green Building Certificate No.: OGB1020) . The rainwater collected from the roof and walls is stored in a raft foundation tank with a capacity of 688 metric tons, which is used for landscape irrigation and replenishing water in ponds. The project also includes the recycling of domestic wastewater, which is treated and used for toilet flushing.