Daan River Zhuolan to Sanyi Access Road Project of Miaoli County

Daan River Zhuolan to Sanyi Access Road Project of Miaoli County

Construction Period:

May 11, 2009-September 27, 2012 

Project Cost:

Approximately NT$ 1.603 billion 

Project Description

The project involves the installation along the north bank of the Da'an River, from west to east, starting from the connection with the old National Highway 13, then connecting to the flood control road on the north side of the Da'an River. After that, it crosses the old Yili Bridge, passes under the New Mountain Line railway, crosses above the old Mountain Line railway tunnel and the Laozhuang Creek, and finally connects to the National Highway 3 Lanse Bridge along the Zhuolan dike. The total length of the route is approximately 10.578 kilometers. The bridge section is constructed using cantilever and advanced support methods.