The CE730B section standard project of the east extension of Bannan Line of the Taipei Metropolitan Mass Rapid Transit System(Electromechanical)

The CE730B section standard project of the east extension of Bannan Line of the Taipei Metropolitan Mass Rapid Transit System(Electromechanical)

Construction Period:

October 2, 2004-April 16, 2012 

Project Cost:

Approximately NT$ 57.95 million 

Project Description

The Taipei Metro System's Nangang Line Eastern Extension Section CE730B Contract (including civil engineering, electrical, environmental control, elevator, and escalator works) is part of the metropolitan area's subway system.

Background of the Project

The civil engineering works of this section start from the joint tunnel of the Ministry of Transportation and Communications' Railway Reconstruction Bureau, extending eastwards through the Yenchiuan Road, and reaching the Nanxi Park below the intersection of Section 1 of Nangang Road and Yenchiuan Road, where the Nanxi Economic and Trade Station (BL18) is located (the station adopts the cut-and-cover method) . The total length of this section is approximately 919 meters, divided into five subsections.