Construction Period:
May 25, 2011-August 30, 2019
Project Cost:
Approximately NT$13.76 billion
May 25, 2011-August 30, 2019
Approximately NT$13.76 billion
This section is a civil engineering project of the first phase of the Taipei Metropolitan Area Mass Rapid Transit System Circle Line. Due to the project requirements, the metro elevated bridge piers are restricted by the height limitation of the Taiwan Provincial Highway 64 bridge. Temporary construction platforms and bored piles were set up above Taiwan Provincial Highway 64 for the construction. There is also a stacked elevated bridge spanning Taiwan Provincial Highway 64, with the installation of large-span continuous steel box girders.